Every building starts with the ground underneath it. Most standard houses in New Zealand can use a set of tried-and-tested foundation details. Some projects need an engineer to design the foundation. This guide explains how to tell which group your project falls into.
- Standard house on good ground: usually no. The foundation can follow the standard details in NZS 3604.
- Anything outside that: yes. Poor ground, unusual designs, steep sites, and commercial or multi-unit buildings usually need an engineer.
- The only sure way to know: check the site first.
NZS 3604 is the New Zealand standard for typical timber-framed houses. Councils accept it as one way to meet the Building Code. It includes ready-made foundation details, but only for certain conditions:
- The ground must be ‘good ground’ (see below).
- The house is generally up to two storeys.
- The spans and loads are standard.
- The site sits within set wind and snow limits.
If any of these don’t apply, the standard details no longer cover the project.
Good ground is soil or rock that can carry the weight of the building without moving much over time. In plain terms:
- It must carry the load. The ground has to be strong enough to take the building’s weight. NZS 3604 sets the technical measure, and an engineer can confirm it for your site.
- It must not move much. Ground that could move 25 mm or more is not good ground, whatever the cause.
These types of ground usually fail the test:
- Clay that swells when wet and shrinks when dry
- Fill that hasn’t been properly placed and compacted
- Soft, loose or wet soils
- Ground affected by frost or high groundwater
- Sand or silt that could liquefy in an earthquake
- Steep or unstable slopes
Councils often ask for a geotechnical engineer to confirm that the ground is good before they approve the foundation. Don’t assume your section passes. Check it.
- The ground isn’t good ground, or you don’t know.
- The site is steep, or it is near a cut, a fill or a retaining wall.
- The house is more than two storeys, or has long open spans, large open-plan areas or steel frames.
- You are adding a new level or extension onto an existing foundation.
- A deck or balcony goes beyond the standard limits.
- The building is commercial, industrial, or a multi-unit or apartment building.
- Your council asks for engineering input during the consent process.
- Geotechnical engineer: checks the ground, including its strength, groundwater and slope stability.
- Structural engineer: designs the foundation and the structure it carries.
- Foundation contractor: builds the foundation to the approved design.
- Producer statements: engineers confirm their design and their checks in writing. Councils rely on these at consent and at completion.
Problems found after digging cost far more than problems found on paper. When the ground turns out to be different from what was expected, you can end up with:
- Extra digging and deeper footings
- More concrete and more materials
- Repeat inspections
- Delays for every trade that follows
Engineering input at the design stage also helps avoid delays at consent. Councils often request more information when ground conditions aren’t clear from the start.
- Get a site survey – accurate boundaries and levels are the starting point.
- Ask your designer or architect whether your house is a standard build or needs engineering.
- Ask your council whether they will need a geotechnical report.
- Book a ground check if the ground is unknown or looks questionable.
- Get an engineered foundation design where it’s needed.
- Share the final design with your foundation team before work starts.
- Design the foundation and the structure together, from the start.
- Send any ground reports to your foundation team early.
- Confirm early whether a standard detail or a site-specific design is needed.
How Rapid Slabs & Precast can help
We offer in-house foundation design and work with engineers, surveyors and designers across the Wellington region. If your site needs more than standard foundation details, we’ll tell you early, before you commit to a design or a budget.
Talk to us:
This guide is general information. Building rules and standards change, and every site is different. Always check with your local council and a qualified engineer before you build.